Use the date that matters to your business
A festival date is not the same as the date goods must reach your warehouse. Work out when stock must be received, checked, allocated, distributed and merchandised. For an event, allow time for installation and resolving missing or damaged components before guests arrive.
Share the destination and required arrival window in the first inquiry. Identify whether the date is fixed or whether split delivery or an alternative assortment could help if a part of the brief becomes impractical.
Map the decisions before production
List the work needed before an order can enter production: product selection, material review, artwork preparation, sample development, local-language review, physical sample approval and commercial confirmation. Put an owner next to each decision.
A schedule based only on a factory production estimate can miss the time spent waiting for artwork or feedback. Agree how approvals will be documented and what happens when a brief changes. Keep a current revision list so decisions do not need to be reopened unnecessarily.
Confirm the plan with each responsible party
Ask the relevant production partner to confirm a feasible schedule against the final specification, quantities and materials. Discuss availability and any dependencies before treating a date as committed. Different components in a coordinated set may follow different production paths.
Confirm inspection, consolidation, packing and shipment handover arrangements as part of the plan. A complete set can be delayed by a small accessory or printed insert, so track component readiness as well as the main item.
Work through the logistics route
Review the intended transport mode and handover responsibilities with the parties handling shipping and importation. Use current quotations and route information for planning; transit conditions and booking availability can change. An estimated transit duration is not a guaranteed warehouse arrival.
Include export preparation, customs procedures, destination handling and warehouse booking requirements where relevant. Confirm trade terms in the commercial documents and make it clear which party supplies each document or instruction.
Build room for review and change
Identify decisions most likely to need a second review, such as a new construction, a complex foil finish, local-language artwork or retailer packaging. Reserve practical time for that review rather than assuming the first sample will resolve every question.
Year-specific artwork needs particular care. Confirm the numeral year, the approved language and any zodiac reference before print approval, and keep them distinct from generic designs. Agree the impact of a late artwork change on the delivery plan.
Maintain one shared milestone record
Track brief confirmation, quotation, sample dispatch, sample approval, order confirmation, production readiness, inspection, packing and shipment handover. Record dates as proposed, confirmed or completed so an early target is not mistaken for a completed milestone.
Send OULAN your target arrival date, selected references, destination and outstanding decisions. We can review the brief with the relevant production partners; timing, order quantities and shipping arrangements are confirmed for the actual project. This guide does not promise a standard lead time.